The FRP manufacturer shall be responsible for undertaking routine production testing through the manufacturing period. Any failures are the manufacturer responsibility to rectify them timely and to the satisfaction of the Albemarle acceptance. The Inspection and Test (ITP) which shall include all the production tests. The following tests are guidance, but not limited to, in order to demonstrate design and quality consistency: