(2) Operating procedures.<br>1. The host is installed in a flat field as required, and the four feet are secured with expansion bolts to ensure the level of the equipment is stable.<br>2. Before starting, the transport fixing plate must be removed, check the machine parts of the connection loose, as well as the rotating parts, moving parts of the touch, collision, card and other phenomena, found that the problem is resolved in a timely manner.<br>3. Switch on the power supply, tap the start switch, and check that the steering is correct in all parts of the machine.
正在翻译中..