In this paper, a coal mine a comprehensive mining work surface through the measurement scheme design, from the ground measurement, contact measurement and underground control measurement, respectively, with two schemes for error estimation, in order to ensure that both schemes meet the requirements of the Regulations and in accuracy to meet the engineering needs of the premise, select the optimal solution as the final design of this through measurement, to ensure that the safety and correct conduct. Firstly, the paper expounds the importance of applying the new measurement technology in the coal mine roadway through measurement, and then analyzes the concrete implementation of the new measurement technology in the coal mine roadway through measurement. The through measurement error is expected to be reliable for all measurements and calculations. Finally, the summary of the measurement results realize that the accuracy of the measurement is affected by the technical level of surveyors, measuring instruments and other factors. In order to provide a useful data reference for the quality and efficiency of coal mine measurement work in the future, and promote the accuracy of coal mine measurement data.
正在翻译中..