These lines shall be located in the bottom level of a pipe rack to minimise the risk of leakage on other pipes and shall not be run through plant areas where a leak would cause a reaction with the materials in the area beneath producing toxic gases. If such a pipe route is unavoidable, provision shall be made for secondary containment and leak detection.