The business requirements for a process gas system may include volume of supply/pressure required at the points of use of the system, etc.Organizations may also list health and safety requirements, especially if these are more stringent requirements than the regulations (e.g., noise levels). The responsibility to identify and comply with these requirements may be left to the designer, as they have that responsibility as the engineer of record.