The research content and conclusions of this paper are:<br>(1) After the cracking of the "K48-800 high-fill cover cover culvert" project using drilling, engineering geological mapping and indoor testing and other comprehensive means of geological survey, the conclusion is: culvert area site is more stable overall, but due to the higher filling, the culvert foundation needs to be processed. It is suggested that the basic form of culvert should be adopted to expand the foundation.<br>(2) The theoretical force analysis and the use of Midas software to model the force and deformation analysis of the cracking cover culvert project, the uneven foundation settlement is the most direct reason for the culvert cracking.<br>(3) The cracking cover culvert body and the top plate for settlement observation, according to the size and rate of settlement, it is concluded that the foundation solidity is basically completed, the foundation is in a stable state, the next step can be carried out.<br>(4) The main reasons for the opening of the culvert of the high-fill edg cover include three aspects: design, construction and maintenance.<br>(5) The treatment measures for the cracking of the culvert of the high-fill edgcover plate usually include the foundation reinforcement, the built-in lining, and the treatment of cracks. For the "K48-800 high-fill cover cover culvert" project, according to its cracking causes, reference to similar Agency measures, and combined with the actual situation of the project, put forward different administrative solutions, from the safety, cost, duration and other aspects of the initial selection of the program. The selected reinforcement scheme is used to model the Midas software for force and deformation analysis to determine the final scheme.<br>(6) After the completion of the reinforcement project, the reinforcement effect of the culvert is evaluated, and the on-site survey data prove that the measures are feasible.<br>Finally, from the point of view of preventing the occurrence of cracking disease in the high-fill cover slab, the proposal sought from the design, construction and maintenance is put forward, with a view to serving as a reference for similar projects.
正在翻译中..