本论文的研究内容和结论为:(1)对开裂后的“K48+800高填方盖板涵”工程采用钻探、工程地质调绘及室内测试等综合手段进行地质勘查,结论为:的英语翻译

本论文的研究内容和结论为:(1)对开裂后的“K48+800高填方盖板涵

本论文的研究内容和结论为:(1)对开裂后的“K48+800高填方盖板涵”工程采用钻探、工程地质调绘及室内测试等综合手段进行地质勘查,结论为:涵洞区域场地整体较稳定,但由于填方较高,需对涵洞基础进行处理。建议涵洞基础形式采用扩大基础。(2)对该开裂盖板涵工程采用理论受力分析验算和利用Midas 软件建模受力及变形分析,地基沉降不均匀是该涵洞开裂的最直接原因。(3)对该开裂盖板涵墙身及顶板进行沉降观测,根据沉降量大小和速率,得出地基固结基本完成,地基处于稳定状态,则可开展下一步处治工作。(4)高填方盖板涵开裂的主要原因包括设计、施工及养护三个方面。(5)高填方盖板涵开裂的处治措施通常包括地基补强、内置衬砌、裂缝处治。对“K48+800高填方盖板涵”工程,根据其开裂成因,参考相似工程处治措施,并结合工程实际情况,提出不同的处治方案,从安全、造价、工期等方面进行方案初步比选。对选出加固方案采用Midas软件建模进行受力及变形分析以确定最终方案。(6)在加固工程完成后,对该涵洞的加固效果进行评价,现场调查资料证明该处治措施是可行的。最后,从预防高填方盖板涵发生开裂病害的角度出发,从设计、施工及养护方面提出建议,以期作为类似工程参考。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Contents and conclusions of this paper are: <br>(1) to "K48 + 800 high fill culvert" project after cracking using drilling, engineering geology tone painted interior and comprehensive means of testing geological survey, the conclusion is: culvert area site as a whole more stable, but due to the higher fill, culverts need to be processed. Recommendations adopted to broaden the base form of culverts. <br>(2) the theoretical cracking culvert works and the proof stress analysis using software modeling Midas stress and deformation analysis, uneven ground settlement is the direct cause of the culvert failure. <br>(3) the crack settlement observation culvert walls and ceiling, according to the size and rate of settlement, ground consolidation obtain substantially complete, the foundation is in a stable state, the work can be carried out next Treatment. <br>(4) the main reason for the high fill culvert cracking include design, construction and maintenance in three aspects. <br>(5) Treatment Measures high fill culvert cracking typically comprises a foundation reinforcement, built lining, crack prevention. To "K48 + 800 high fill culvert" project, according to its causes cracking, reference works similar punishment measure, combined with the actual situation of the project, proposed a different punishment project, a program in terms of safety, cost, duration and other preliminary comparison . Reinforcement of the selected program uses Midas software modeling carried stress and deformation analysis to determine the final program. <br>(6) After the reinforcement project is completed, the reinforcement effect culverts were evaluated on-site survey data to show where governance measures are feasible. <br>Finally, from the perspective of prevention of high fill culvert cracking disease starting from proposals design, construction and maintenance aspects, with a view to similar projects.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The research content and conclusions of this paper are:<br>(1) After the cracking of the "K48-800 high-fill cover cover culvert" project using drilling, engineering geological mapping and indoor testing and other comprehensive means of geological survey, the conclusion is: culvert area site is more stable overall, but due to the higher filling, the culvert foundation needs to be processed. It is suggested that the basic form of culvert should be adopted to expand the foundation.<br>(2) The theoretical force analysis and the use of Midas software to model the force and deformation analysis of the cracking cover culvert project, the uneven foundation settlement is the most direct reason for the culvert cracking.<br>(3) The cracking cover culvert body and the top plate for settlement observation, according to the size and rate of settlement, it is concluded that the foundation solidity is basically completed, the foundation is in a stable state, the next step can be carried out.<br>(4) The main reasons for the opening of the culvert of the high-fill edg cover include three aspects: design, construction and maintenance.<br>(5) The treatment measures for the cracking of the culvert of the high-fill edgcover plate usually include the foundation reinforcement, the built-in lining, and the treatment of cracks. For the "K48-800 high-fill cover cover culvert" project, according to its cracking causes, reference to similar Agency measures, and combined with the actual situation of the project, put forward different administrative solutions, from the safety, cost, duration and other aspects of the initial selection of the program. The selected reinforcement scheme is used to model the Midas software for force and deformation analysis to determine the final scheme.<br>(6) After the completion of the reinforcement project, the reinforcement effect of the culvert is evaluated, and the on-site survey data prove that the measures are feasible.<br>Finally, from the point of view of preventing the occurrence of cracking disease in the high-fill cover slab, the proposal sought from the design, construction and maintenance is put forward, with a view to serving as a reference for similar projects.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The research contents and conclusions of this paper are as follows:<br>(1) For the cracked "K48 + 800 high fill slab culvert" project, drilling, engineering geological mapping, indoor testing and other comprehensive means are used for geological exploration. The conclusion is that the site in the culvert area is generally stable, but the culvert foundation needs to be treated due to the high filling. It is suggested that the culvert foundation should be enlarged.<br>(2) For the cracked slab culvert project, theoretical stress analysis and checking calculation are used, and Midas software is used to model stress and deformation analysis. Uneven foundation settlement is the most direct cause of the culvert cracking.<br>(3) Based on the settlement observation of the wall body and roof of the cracked slab culvert, according to the settlement amount and rate, it is concluded that the consolidation of the foundation is basically completed and the foundation is in a stable state, then the next treatment work can be carried out.<br>(4) The main reasons for cracking of high fill slab culvert include design, construction and maintenance.<br>(5) The treatment measures for cracking of high fill slab culvert usually include foundation reinforcement, internal lining and crack treatment. For K48 + 800 high fill slab culvert project, according to the causes of its cracking, referring to the treatment measures of similar projects, and combining with the actual situation of the project, different treatment schemes are proposed, and the schemes are preliminarily compared and selected from the aspects of safety, cost and construction period. Midas software is used to analyze the stress and deformation of the selected reinforcement scheme to determine the final scheme.<br>(6) After the completion of the reinforcement project, the reinforcement effect of the culvert is evaluated, and the field investigation data prove that the treatment measures are feasible.<br>Finally, from the point of view of preventing the cracking of high fill slab culvert, some suggestions are put forward from the aspects of design, construction and maintenance, in order to serve as a reference for similar projects.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: