Reinforced concrete wall template construction process is: pre-installation inspection→ installation door window template→ installation of the first step template (both sides) → the installation of steel corrugated → adjustment template straight→ installation of the second step to The top two sides of the template → the installation of steel corrugated straight → installation through the wall screw→ the installation of external corrugated → with oblique support and adjust the template straight → connected with columns, walls, floors.
正在翻译中..