1.07 Rates for measured work are deemed to include the costs of: preparation of surfaces to receive membranes and coatings, primers, bonding compounds, underlays, adhesives, keying mixes and mechanical fastenings, hot and cold bonding applications, and mechanical fixing applications, applying coatings by brush or spray, sloping and curved work to coatings, work of any width, height or girth, work laid to falls and cross falls, and intersections on sloping work, cutting, notching, bending, fair edges, jointing, bonding and sealing including extra material for laps to sheet work, raking, stepped and vertical work to skirtings, aprons, abutments and the like, edges, angles, arises, intersections and the like, turning into grooves including extra material, wedging and sealing, and working into channels and the like, angle fillets, battens and nailing strips, linings to sumps, outlets, gargoyles, dishing to gullies and the like, flashing materials other than metal flashings, holes for pipes and the like, forming collars and sealing, flood tests, provision of guarantees and warranties. 2. Protective Coverings 2.01 Each kind of work is given separately, stating the type of material. 2.02 Thickness, dimensions, types and details are stated in descriptions where necessary to identify the work.