Through the quality of the production process to carry out project improvement, pull the relevant responsible units to analyze the problem, improve. A total of 19 issues will be closed in 2020 for procurement, R.D. and GA. The PTU at the time of the 19 problems was 1,342, which had dropped to 55 in the 15 weeks.
正在翻译中..