[Abstract] the Hongtang Road Station of Fuzhou Metro Line 5 is narrow, close to residential quarters, and there are 110kV high-voltage lines above some construction parts. The construction environment is complex. The trench depth of diaphragm wall is 43.9-46.5m, and the length of reinforcement cage is 42.8-45.8m. Combined with the engineering practice, starting from the analysis of reinforcement cage hoisting measures, this paper puts forward and adopts the scheme of overall fabrication and sectional hoisting of reinforcement cage, so as to give full play to the safety and efficiency of reinforcement cage hoisting in the complex environment. Through the introduction of the selection of reinforcement cage hoisting equipment, the safety control in the hoisting process and the splicing quality of reinforcement cage, This paper summarizes and forms a set of key technologies of reinforcement cage hoisting construction in complex environment, which can provide reference for similar projects.<br>Key words: complex environment, diaphragm wall, reinforcement cage, hoisting.<br>
正在翻译中..