According to the design requirements of "light fixture installation large sample map" and the "roadway elevation map" of the construction of the field, the elevation of the mats and the relevant points of the surface layer is calculated.<br>Measure the water stability layer and its related point elevation with a level, determine the depth of the pre-buried pipe groove and the height of the pipe port, and fix the point with the steel pile. ...
正在翻译中..