Regarding remarks C.2, No equipment to do power consume check, capacity check & weight check, only the unloaded function test was performed on site, the result was acceptable., we need you to provide guarantee letter for this order, draft and our PO attached.
Regarding remarks C.2, No equipment to do power consume check, capacity check & weight check, only the unloaded function test was performed on site, the result was acceptable., we need you to provide guarantee letter for this order, draft and our PO attached.<br>