The specific practice is to set up the cut-off well before the sewage cut-off pipe, the pipe diameter of the cut-off pipe is determined according to the multiple of the cut-off, the dry season sewage and the initial rainwater into the sewage cut-off dry pipe, when the increase of the amount of rainwater exceeds the water transfer capacity of the cut-off dry pipe, part of the sewage and rainwater will be spread through the overflow pipe in the cut-off well into the river, pollution of the water body
正在翻译中..