In the case, there is a considerable problem with the handling of hybrid costs. In the process of producing goods in Hubei Tailong company, the machine in the start-up and warm-up stage, the energy consumption generated by this stage is larger, at the same time, each production line is in accordance with the law of power-up, in the company's actual operation process, directly the part of the energy consumption into the variable cost part, did not distinguish the mixed cost into fixed costs and variable costs (the power-up part should be fixed costs, and with the official production of energy consumption is among the variable costs). "As a result, fixed costs are undervalued and variable costs are overvalued." Thus, according to the relevant break-even point and Poly point analysis of the sales volume is bound to be underestimated. Because the related Poly sales are undervalued, the relevant profits will inevitably not be realized when the sales volume is realized.
正在翻译中..