Set the ESS to the test bed Set the test data as Description of test requirements Test finished, ensure all HV and LV power supply off, collect test data and prepare test report.Test report should include: All the test results and events during testing Temperature and humidity of environment BMS System SOC/Voltage/Current/Temp. vs time curve BMS Max/Min Cell voltage and cell voltage deviation vs time curve Temperature sensors data vs time curve Thermal imager pictures LV current and voltage vs time curve Test set up picture and battery pictures before and after test, and abnormal detail Photos of ESS should be taken before and after the test including: HVB Surface (overview and detail) BJB Surface(overview and detail) HV Connectors(BJB) LV Connectors(BJB, Pack body) Cooling connectors If any events happened, snipping pictures from the video DTC before and after test snipping pictures Force-path diagram Speed-distance diagram First contact Battery housing with module / cell: time, way, force Degree of deformation All tightening and residual (retightening) torque The combination of variables for above test curves can adjusted if needed