If pre-formed sections are used, the insulation shall be pre-formed or fabricated in singlematched halves to the maximum extent possible. Where multi-layering is necessary,longitudinal and circumferential joints shall all be staggered. All individual segments shall be cemented together with suitable fabrication adhesive.