Contents in detail:1. AWF machine card2. Spare parts lists, wearing parts lists3. A set of drawings of the main wearing parts4. A set of schematic circuit diagrams5. A control system manual; does not apply to standard models but to non-standard ones6. PLC control system program in the form of an FUP (Function Plan), a KOP (ladder diagram), or an STL (Statement List)7. Input/output flag reference list and cross reference list8. In the case of assembler programs: an assembled list9. In the case of high-level languages: A source list10. A process structure is to be drafted in all cases11. A complete copy of the PLC control system program on CD, two copies12. A set of functional descriptions and position plans for electrical, pneumatic and hydraulic switching and control elements, and relating to the control system for the switch cabinet, the machinery and units of equipment13. Certificates relating to component construction, welding and pressure tests, if required14. Confirmations pursuant to section 5 paragraph 4 UVV (Accident Prevention Regulations) - Electrical installations and equipment (BGV A3)15. A list of pressure gauges - the pressure gauges that, pursuant to DIN ISO 9000ff and VDA (German Automotive Industry Association) Volume 6.1, are to be classified as being of relevance to quality (e.g. the punch pressure in the case of a hydraulic press).