2.3.3 SECTION 7 ELECTRICAL OPERATING CONDITIONS7.4 Three-phase a.c. machines operating on unearthed systemsAdd to this clause:The machines shall be suitable to operate for periods of up to 8 hours on an unearthed system with an earth fault on one phase. The maximum cumulative hours of operation in this mode will be restricted to 125 hours/ year.