Leave two vehicles (Weichai and BFCEC) to pull the faulty vehicles, pull the designers to carry out sample trial installation and <br>leave the vehicles with the wiring harness plug-in problem, organize the analysis <br>, and refine the failure modes in the final inspection. 2. Organizational analysis of the breakdown car. <br>In the final inspection, 100% left the steering wheel to rotate the abnormal noise car, organize relevant personnel to analyze and <br>recommend the final assembly online leak detection, and find the problem to prompt the supplier's on-site service to replace. <br>When the vehicle is off the assembly line, turn on the double flashing warning lights and the outline lights, and conduct online monitoring. General <br>assembly organization. On-site review will pull design, procurement, external inspection, and quality review on the wiring harness plug-in problem.
正在翻译中..