本论文采取地勘、现场监测、理论受力分析验算和利用Midas软件建模进行受力及变形分析等措施对开裂后“K48+800高填方盖板涵”工程进行研究的英语翻译

本论文采取地勘、现场监测、理论受力分析验算和利用Midas软件建模进行

本论文采取地勘、现场监测、理论受力分析验算和利用Midas软件建模进行受力及变形分析等措施对开裂后“K48+800高填方盖板涵”工程进行研究,分析其开裂成因。根据开裂成因,提出不同的处治方案,从结构、造价、工期等方面进行方案比选,确定最佳方案。对该加固方案采用理论受力分析验算和利用Midas软件建模进行受力及变形分析以确定最终的加固措施,在工程竣工后对该涵洞的加固效果进行调勘,以证明处治措施的可行性。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In this paper, taking the geological survey, site monitoring, checking and using the Midas theory stress analysis software modeling carried stress and deformation analysis and other measures after cracking "K48 + 800 high fill culvert" engineering research, analyze its causes cracking . The cracking in the proposed scheme different Treatment, in terms of structure for the program, cost, and other than the selected period, to determine the best solution. Reinforcement theory stress analysis using the checking and using the Midas software modeling carried out by the force and deformation analysis to determine the final reinforcement measures, tune survey of the culvert reinforcing effect after completion of the project to demonstrate the feasibility of the disposal measures .
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
本论文采取地勘、现场监测、理论受力分析验算和利用Midas软件建模进行受力及变形分析等措施对开裂后“K48+800高填方盖板涵”工程进行研究,分析其开裂成因。根据开裂成因,提出不同的处治方案,从结构、造价、工期等方面进行方案比选,确定最佳方案。对该加固方案采用理论受力分析验算和利用Midas软件建模进行受力及变形分析以确定最终的加固措施,在工程竣工后对该涵洞的加固效果进行调勘,以证明处治措施的可行性。
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In this paper, the measures of geological exploration, field monitoring, theoretical stress analysis and checking calculation, and stress and deformation analysis by using Midas software modeling are taken to study the "K48 + 800 high fill slab culvert" project after cracking and analyze the causes of cracking. According to the causes of cracking, different treatment schemes are put forward, and the best scheme is determined by comparing and selecting schemes from the aspects of structure, cost and construction period. In order to determine the final reinforcement measures, the theoretical stress analysis and checking calculation are adopted for the reinforcement scheme, and the stress and deformation analysis are carried out by using Midas software modeling. After the completion of the project, the reinforcement effect of the culvert is surveyed to prove the feasibility of the treatment measures.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: