The duration cost includes two aspects: first, the cost of measures taken by the project management department to ensure the duration, and second, the cost of the owner's claim caused by the delay of the duration, which can also be called the duration loss. Due to the internal and external environment and contractual conditions, it is a very difficult task to reduce costs to ensure the duration of the contract. Therefore, the relationship between construction duration measure cost and duration loss must be correctly handled.