甲氨蝶呤片引入309车间5楼片剂生产线的变更(后续处理):1.增加 “完成甲氨蝶呤片后续可行性批次的生产,并完成相应的清洁确认报告和可行性批的英语翻译

甲氨蝶呤片引入309车间5楼片剂生产线的变更(后续处理):1.增加 “

甲氨蝶呤片引入309车间5楼片剂生产线的变更(后续处理):1.增加 “完成甲氨蝶呤片后续可行性批次的生产,并完成相应的清洁确认报告和可行性批次报告”该项措施。2.将变更措施项“起草甲氨蝶呤片工艺验证方案、清洁验证方案、工艺规程及批记录并培训”延期至2019.12.31。3.将变更措施项“完成工艺验证报告及清洁验证报告”延期至2020.04.30。"
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Methotrexate sheet changes are introduced (subsequent process) 309 5 workshop floor tablet production line: <br>1. Add "to complete the feasibility of subsequent batches of sheet production methotrexate, and complete the feasibility of cleaning validation report and batch report "of the measure. <br>2. Change action items "Methotrexate tablets drafting process validation scheme, cleaning validation program, batch records and process planning and training" postponed to 2019.12.31. <br>3. Change action items "to complete the process validation and cleaning validation report Report" postponed to 2020.04.30. "
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Changes to the tablet production line for the introduction of methotrexate tablets on the 5th floor of the 309 workshop (follow-up):<br>1. Increase the "complete the production of the subsequent feasibility batch of methotrexate tablets, and complete the corresponding cleaning confirmation report and feasibility batch report" this measure.<br>2. Postpone the change measure item "Draftmethotrextablet process verification program, cleaning verification program, process procedure and approval record and training" to 2019.12.31.<br>3. Extend the change measure item "Complete Process Verification Report and Cleaning Verification Report" to 2020.04.30. "
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Change of tablet production line on floor 5 of workshop 309 for the introduction of Methotrexate Tablets (follow-up treatment):<br>1. Add the measure of "complete the production of subsequent feasible batches of methotrexate tablets, and complete the corresponding cleaning confirmation report and feasibility Batch Report".<br>2. Postpone the change measure item "drafting the methotrexate process validation plan, cleaning validation plan, process procedures, batch records and training" to December 31, 2019.<br>3. Postpone the change measure item "completion of process validation report and cleaning validation report" to April 30, 2020. "<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: