Chutes shall be completely enclosed and shall be equipped, at intervals of 6.00 meters or less, with substantial stops to prevent descending materials from attaining dangerous speeds. Proper tools shall be provided and kept available to loosen materials or debris jammed in the chute. No materials or debris shall be dropped from any part of a building under demolition to any point outside the walls of the building except through properly enclosed wooden or metal chutes