Half of the pumps have arrived, and some of the static equipment has arrived. Most of the equipment will arrive at the end of June, and the latest equipment will be C5002C.
Half of the pump has arrived, some static equipment has arrived, most of the equipment will arrive at the end of June, the latest equipment c5002C will be in early August to the scene.
Half of the pumps have arrived, part of the static equipment has arrived, most of the equipment will arrive at the end of June, and the latest equipment is c5002c, which will arrive at the site in early August.<br>