3) The maximum horizontal principal stress is sometimes not along the horizontal direction, and the well location and length should be arranged according to the specific calculation results. Study the verification of determining the main direction of in-situ stress and the calculated value of three-dimensional in-situ stress field with reference to microseismic monitoring information, and effectively reduce the calculation error. The application of finite element numerical analysis method in engineering research can make up for the shortcoming that analytical solutions are not accurate enough. The obtained three-dimensional fine numerical solutions of in-situ stress field in Wei 202 and Wei 204 blocks of Weiyuan shale gas field can help to optimize the layout design of horizontal wells and the selection of technical parameters of hydraulic fracturing.
正在翻译中..