For safety reasons, it is recommended the plant set a realistic maximum mixtime for each spec based on the average mix times plus 30 seconds. Thiswill assure that an unsafe temperature is not reached if both thermocouplesfail or become insulated during a mix. Batch discharge then will occur onmaximum time, avoiding a Batch Critical Temperature situation.