The manager is claim that the new process will be faster than the old process. Although the first step will take twice as long under the new process, the manager claims they “should” be able to drop the second and third steps. If dropping the second and third steps saves even more time than is lost during the first step, then the manager is assuming that these other steps will save a lot more time.