'Metrics are defined and tracked to evaluate the design/new product introduction process (e.g. cost, time), product design (e.g. quality goal, reliability goal) 'Project specific metrics demonstrate that quality and reliability goals have been achieved consistently as early as possible in the product lifecycle (e.g. minimal need for corrective actions )