(1) After heating contraction to temper 5-8 minutes, can make the filling to obtain good anti-corrosion sealing performance, which is the key to the success or failure of the filling port anti-corrosion.<br>(2) Avoid shrinkage immediately after the completion of the fire, hot melt with the increase in tempering time, temperature increase and become soft, sticky, flow, then the adhesive surface and moist primer combination surface has bonding conditions.
正在翻译中..