Based on the analysis of audit problems from January to may, through the control and improvement of parts problems, body painting problems, general assembly problems, design problems, module group, PDI control and STS improvement, the quality control score can be reduced by 74.2, improvement score by 50.7, and total score by 124.9
正在翻译中..