This week, compared with last week, the number of weekly projects has not changed as a whole; measures have been formulated for the air horn solenoid valve joint leakage problem, and the current status is to be implemented; the long-term measures for the transmission control device trachea fixation problem have been verified and passed and transferred to the supervision period.
正在翻译中..