use the red switch on the power connection on the side of the syngas generator to supply power to the system.Once the switch it closed,verify that both temperature controllers are illuminated and set to 450℃.Once the syngas generator has reached 450℃ for both the vaporizer and the reactor,the feedstock pump can be turned on