根据设计图纸放出线路中心及边线,测量中一般直线段每l0m放出边桩及标高,曲线段加密,每5m放桩。桩点采用φl2钢筋加设.在钢筋桩上将标高控制的英语翻译

根据设计图纸放出线路中心及边线,测量中一般直线段每l0m放出边桩及标高

根据设计图纸放出线路中心及边线,测量中一般直线段每l0m放出边桩及标高,曲线段加密,每5m放桩。桩点采用φl2钢筋加设.在钢筋桩上将标高控制线准确标记,测设时临时水准点设于隧道边墙,每100~150m设置一个,以便施工中及时复核。施工中禁止扰动导向线,特别是正在摊铺作业时,严禁碰撞。导向线振动幅度较大时,停止施工作业,防止出现波状路面。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
According to the design drawings, the line center and the side line are released. In the measurement, the general straight section releases the side pile and elevation every 10m, the curve section is encrypted, and the pile is placed every 5m. The pile point is added with φl2 steel bar. Accurately mark the elevation control line on the reinforcement pile, and set the temporary leveling point on the side wall of the tunnel during surveying and setting, one every 100-150m, so as to review in time during construction. <br>It is forbidden to disturb the guide line during construction, especially when paving operations, collision is strictly prohibited. When the vibration amplitude of the guide line is large, stop the construction work to prevent the appearance of wavy roads.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
According to the design drawings to release the center of the line and edge, the measurement of the general straight line section per l0m release edge pile and elevation, curve segment encryption, every 5m pile. The pile point is reinforced with reinforced steel. On the steel pile will be accurately marked the elevation control line, the temporary level point is located in the tunnel side wall, every 100 to 150m set one, in order to timely review during construction.<br>Disturbance guides are prohibited during construction, especially when paving operations are being made. When the vibration amplitude of the guide line is large, the construction work is stopped to prevent the appearance of wave-like road surface.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The center and sideline of the line shall be set out according to the design drawings. In the survey, the side piles and elevation shall be set out every 10m for the general straight line section. The curve section shall be densified and the piles shall be set out every 5m. The pile point shall be added with φ L2 reinforcement. The elevation control line shall be accurately marked on the reinforcement pile. During the survey, the temporary benchmark shall be set on the side wall of the tunnel, and one shall be set every 100-150m, so as to facilitate the timely review during the construction.<br>It is forbidden to disturb the guide line during construction, especially in the process of paving, collision is forbidden. When the vibration amplitude of the guide line is large, the construction operation shall be stopped to prevent the occurrence of wavy pavement.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.