INTRODUCTION: ArcelorMittal, Kryviy Rih, Ukraine, (AMKR) intends to revamp the existing Blast Furnace 9. As a part of the revamping program AMKR intends to augment following area. Blast Furnace proper Blast Furnace top including out rigger crane. Cast House Water and utility system Gas Cleaning Plant (including dust catcher modification and dirty gas pipelines) New Slag Granulation Plant. Cast House and stock house aspiration system Electrics, Instrumentation and automation systemBF-9 is currently in operation and 1st category capital repair of the furnace is scheduled on 2022.Major KPI : BF proper shall be revamped during the shutdown period which is of 112 days.