In the future, we only need to use the lift for 2 days. Can the 3 sets of lifts be returned to the supplier, because this can reduce the space occupied.
In the future, we only need to use the lift for 2 days. Can we help return some of the 3 sets of lift to the supplier, because this can reduce the occupation of the site.