The average lump-sum $50,000 in savings reduces the bunker cost share of the overall freight from an average 82% t0 81%. With speeds reduced to 10 knots on both the laden and ballast legs of the voyage, bunker cost savings could have topped lump-sum $270,000 reducing the bunker cost share of freight revenue to an average 78%.