根据《实用供热空调设计手册》第26.10.5-4条规定,冷却塔的补水量包括风吹飘逸损失、蒸发损失、排污损失和泄漏损失,一般按冷却水量的 1%的英语翻译

根据《实用供热空调设计手册》第26.10.5-4条规定,冷却塔的补水量

根据《实用供热空调设计手册》第26.10.5-4条规定,冷却塔的补水量包括风吹飘逸损失、蒸发损失、排污损失和泄漏损失,一般按冷却水量的 1%~2%作为补水量。不设集水箱的系统,应在冷却塔底盘处补水,设集水箱的系统,应在集水箱处补水。故冷却塔补水量为71.64×1%=0.71m³/h,冷却塔的水量71.64+0.72=72.36m³/h。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
According to Article 26.10.5-4 of the "Practical Heating and Air Conditioning Design Manual", the water replenishment of the cooling tower includes wind drifting loss, evaporation loss, blowdown loss and leakage loss. Generally, 1% to 2% of the cooling water is used as water replenishment the amount. For systems without a water collection tank, water should be replenished at the cooling tower chassis, and for systems with a water collection tank, water should be replenished at the water collection tank. Therefore, the amount of water supplied to the cooling tower is 71.64 × 1% = 0.71m³ / h, and the amount of water supplied to the cooling tower is 71.64 + 0.72 = 72.36m³ / h.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
According to Article 26.10.5-4 of the Practical Heating air conditioning design manual, the rehydration of cooling towers includes wind and ventilation losses, evaporation losses, sewage losses and leakage losses, generally according to the cooling water volume of 1% to 2% as the rehydration. Systems without a water tank should be filled at the undercarriage of the cooling tower, and the system with a water tank should be replenished at the water collection tank. Therefore, the cooling tower tonic water is 71.64 x 1% x 0.71m3/h, the cooling tower water 71.64 x 0.72 x 72.36m3/h.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to article 26.10.5-4 of practical heating and air conditioning design manual, the make-up water volume of cooling tower includes wind drift loss, evaporation loss, blowdown loss and leakage loss. Generally, the make-up water volume is 1% - 2% of the cooling water volume. For the system without water collecting tank, make-up water shall be provided at the bottom of cooling tower, and for the system with water collecting tank, make-up water shall be provided at the water collecting tank. Therefore, the make-up water volume of cooling tower is 71.64 × 1% = 0.71m3/h, and the water volume of cooling tower is 71.64 + 0.72 = 72.36m3/h.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: