An extra wall is placed.Note this means changes in the construction.Door and other elements needs to be moved to the Mock Up area.Hight of the meeting area sam height as the floor height of the construction in the Middle zone to keep this on one line.This means the window at the outside wall needs to be changed.On the ceiling plant boxes with fake plants are placed to create an image like below.If possible add carpet or part of the floor from the fair on the ground.Walls will have a solution of Burgeree.Look and feel like image on this page. 1 door on the right side