Through comparison, it can be seen that the vacuum pre-pressure method has a large processing depth, low cost, moderate duration, very suitable for the site's foundation treatment. In further improving the pre-pressurized load, as much as possible to increase the construction subsidence, vacuum pre-pressure can be used, and combined with layered crushing method to further improve the surface filling soil density and carrying capacity.<br>In view of the engineering geological conditions of this project, in line with the principle of "local conditions, economic rationality", we recommend the use of "vacuum water-borne joint pre-pressure-impact combined technology" based on the drainage cementing method of the composite foundation treatment method, and according to the characteristics of each division using different construction methods and construction parameters, so that the site to meet the design requirements.