Use dry compressed air or nitrogen. Divided into three boosts, the first 6barg, the second 16 barg, the third to the design pressure, the first second regulator 3 minutes, check the fast open blind plate sealing state, the third guarantee 30 minutes, check the fast open blind plate sealing state.
正在翻译中..