1. 01jan2022, the inbound distribution supplier of the third production department was switched from puyun to eucalyptus, and the switching was stable. At present, the night shift support is carried out by 4 vehicles.
1. 01Jan2022, the inbound distribution supplier of the third production department was switched from Puyun to eucalyptus, and the switching was smooth. At present, the night shift support is carried out by 4 vehicles.