On December 9, through field analysis of the faulty car, it was found that the z-direction deviation of the handrail installation point on the left side of the BIW was 2mm. In the later stage, R & D was required to provide the BIW factory with the specific dimensions to be adjusted. The BIW factory was responsible for the specific improvement of BIW<br>
正在翻译中..