通过PTU、Audit数据分析,钢圈划伤问题有下降趋势,但效果不明显。临时措施存在的主要问题:钢圈来货还是存在划伤(由100%降到45%);的英语翻译

通过PTU、Audit数据分析,钢圈划伤问题有下降趋势,但效果不明显。

通过PTU、Audit数据分析,钢圈划伤问题有下降趋势,但效果不明显。临时措施存在的主要问题:钢圈来货还是存在划伤(由100%降到45%);压边划伤补漆不到位(由100%降到60%),物流运输排序改进完成(由10%降到0),后尾补漆不到位,存在漏补(由80%降到50%);永久措施存在的主要问题:总装吊具新制作滚轮验证不达标,需要延期到19.11.30,供应商包装、压边工装、自动上线方案按计划推动改进
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
By PTU, Audit data analysis, rims scratching problems on the downside, but the effect is not obvious. The main problems for interim measures: Wheel to the goods or the presence of scratches (from 100% to 45%); blank scratched-up paint is not in place (from 100% to 60%), improved logistics and transport ordering complete (by the 10% to 0), the end of the fill paint is not in place, there is leakage complement (from 80% to 50%); made permanent main problems: the production of new roller spreader assembly verification is not up to the required extension 19.11.30 , packaging suppliers, blank tooling, automatic on-line program to promote the planned improvements
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Through PTU and Audit data analysis, there is a downward trend in the problem of steel ring scratch, but the effect is not obvious. The main problems in the temporary measures are: steel ring shipment or scratch (from 100% to 45%), pressure edge scratch to repair paint is not in place (from 100% to 60%), logistics transport ation improvement (from 10% to 0), rear-end paint is not in place, there is leakage (from 80% to 50%) The main problems of permanent measures: the new production roller verification of the total assembly crane is not up to standard, need to be extended to 19.11.30, supplier packaging, press edge tooling, automatic on-line program as planned to promote improvement
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Through the analysis of PTU and audit data, the problem of steel ring scratch has a downward trend, but the effect is not obvious. The main problems existing in the temporary measures are: the incoming steel rings are still scratched (from 100% to 45%); the edge pressing scratched and paint patching are not in place (from 100% to 60%), the logistics and transportation sequence improvement is completed (from 10% to 0), the rear tail paint patching is not in place, and there is missing repair (from 80% to 50%); the main problems existing in the permanent measures are: the verification of the new production roller of the General Assembly spreader is not up to standard, which needs to be postponed By 19.11.30, the supplier's packaging, blank holder tooling and automatic online plan will promote improvement as planned<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: