1.02 Equipment and ancillaries are enumerated. 1.03 Fire suppression systems for fume hoods are enumerated. 1.04 The rate of measured work is deemed to include the costs of: factory assembled components and controls, delivery, storage and handling, specialties, trims, connections, and accessories as specified, insulation and jacketing where applicable, cleaning and adjusting, piping and ductwork connections and coordinations, concrete bases and support pads, and other related concrete work, platework and supporting steelwork, prefabricated panels, insulation and assembling components, wall, ceiling and floor finishing, doors and accessories, access ramps, refrigerant equipment, refrigerant piping, insulation and accessories, lighting, controls including temperature gauges and alarms, lighting, electrical connections and terminations, preparing instruction manuals and spare parts lists and submitting required number of copies, loose keys, tools, extra materials (where specified).