5. From 2018 to now, engineer of technical quality office of Chongya wind power operation and maintenance business department It is mainly responsible for the maintenance of the main speed-up gearbox of wind power generation. The specific contents include: disassembly of the main speed-up gearbox of wind power generation in charge of return to the factory for maintenance, fault inspection and judgment of the gearbox; finding and analyzing the cause of the fault, and Issuing the failure analysis report; issuing the technical scheme for improving and optimizing the quality of the gearbox; processing and manufacturing, assembly and experiment of the maintenance gearbox<br>
正在翻译中..