Problem Description: at 2:00 p.m. on February 29, 2020, we received the feedback from the problem description: February 29, 2020 at 2 p.m. The liquid, which has been verified as a fault in the urea injection line of Hebei Asia University, is caused by the fault yin of the lines 6, 8 and 5 of the line. Line 6 and 8 are marked in blue, with a three-way connection between the two tubes, and line 5 color marked green for the whole tube. However, the actual line 6,8 for the whole pipe, line 5 in the middle for the three-way connection. Causes urea to be connected to the cooling lines.
正在翻译中..