60 units of 5614.24 and 60 units of 5614.28 have been delivered together with PO13. We have added 40 units in PO2, and need to be delivered together with PO1 in late April.
60 5614.24 and 60 5614.28 have been delivered together with po13. We have added another 40 in PO2 and need to deliver them together with po1 in late April.