In the construction of guizhou mountain road, the high-filled embankment is the most common type of culvert in highway engineering, and the high-filled cover plate culvert is the most disease type of such culvert. High-fillculum culvert cracking will have serious consequences and great losses in terms of safety and economy. How to prevent the cracking of the culvert of the high-fill cover cover is a very important problem. Therefore, in this paper, in view of the "S304 Xinmin to Injiang County Road Reform and Expansion Project" project in Guizhou Province, K48-800 high-filling (filling 27 meters) cracking cover culvert project specific examples, combined with literature, etc., to the high-fill edging cover culvert cracking cause analysis, after the cracking measures were studied.
正在翻译中..