During the installation process, it was found that many parts of the spot welding between the PK731 intake flange and the ash hopper inlet pipe had been separated. Will this part need to be fully welded in the future?<br>Are import and export square pipes and variable diameter pipes (C3544_L074A010_(0.0)_A, C3544_L074A011_(0.0)_A, C3544_L075A010_(0.0)_A, C3544_L075A011_(0.0)_A) and sliding platforms (C3544_D73CD010_(0.0)_A) supplied by ENGITEC? When will these be sent to our company?<br>