本文建立了适用于滨海粉土地基条件下基坑降水的饱和-非饱和三维地下水模型,并仿真分析强涌潮、降雨、井点失效等复杂条件对基坑降水效果的影响。通过的英语翻译

本文建立了适用于滨海粉土地基条件下基坑降水的饱和-非饱和三维地下水模型

本文建立了适用于滨海粉土地基条件下基坑降水的饱和-非饱和三维地下水模型,并仿真分析强涌潮、降雨、井点失效等复杂条件对基坑降水效果的影响。通过模型分析发现在五十年一遇、百年一遇强涌潮作用下口门处基坑的水位变化较大,水位上升迅速,对基坑安全施工存在极大的影响,而对于船闸基坑水位影响相对较小;在降雨工况中持续暴雨对基坑水位影响加大,其水位上升过程较快,但仍可以在降雨时对基坑抽水做出调整,但是遭遇持续大暴雨情况下,基坑水位上升迅速,需要提前做好相应措施;在强涌潮和降雨的共同作用下,基坑水位明显提升,且上升迅速。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
This paper establishes a saturated-unsaturated three-dimensional groundwater model suitable for foundation pit precipitation under coastal powder soil foundation conditions, and simulates and analyzes the influence of complex conditions such as strong tides, rainfall, and well point failure on the foundation pit precipitation effect. Through model analysis, it is found that under the action of strong tides that occur once in 50 years or once in a century, the water level of the foundation pit at the entrance changes greatly, and the water level rises rapidly, which has a great impact on the safe construction of the foundation pit, while for the ship lock foundation pit The influence of the water level is relatively small; in the case of rainfall, the impact of continuous heavy rain on the water level of the foundation pit is greater, and the water level rises faster, but it is still possible to adjust the pumping of the foundation pit during rainfall. The water level of the pit is rising rapidly, and corresponding measures need to be taken in advance; under the joint action of strong tides and rainfall, the water level of the foundation pit has increased significantly and rises rapidly.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
This article establishes a saturated unsaturated three-dimensional groundwater model suitable for foundation pit dewatering under coastal silt foundation conditions, and simulates and analyzes the impact of complex conditions such as strong tidal bore, rainfall, and well point failure on the dewatering effect of foundation pits. Through model analysis, it was found that the water level of the foundation pit at the entrance changes significantly under the action of strong tidal surges that occur once every 50 years or once every 100 years, and the water level rises rapidly, which has a significant impact on the safe construction of the foundation pit, while the impact on the water level of the ship lock foundation pit is relatively small; The continuous rainstorm has greater impact on the foundation pit water level during the rainfall condition, and the water level rises rapidly, but the foundation pit pumping can still be adjusted during the rainfall. However, in the case of continuous heavy rainstorm, the foundation pit water level rises rapidly, and corresponding measures need to be taken in advance; Under the combined action of strong tidal bore and rainfall, the water level in the foundation pit significantly increases and rises rapidly.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In this paper, a saturated-unsaturated three-dimensional groundwater model suitable for foundation pit dewatering in coastal silt foundation is established, and the influence of complex conditions such as strong tidal bore, rainfall and well point failure on foundation pit dewatering effect is simulated and analyzed. Through the model analysis, it is found that the water level of the foundation pit at the entrance changes greatly and rises rapidly under the action of the strong tidal bore with a return period of 50 years and a return period of 100 years, which has great influence on the safe construction of the foundation pit, but has relatively little influence on the water level of the foundation pit of the ship lock. The influence of continuous rainstorm on the water level of foundation pit is increased under the condition of rainfall, and the water level rises rapidly, but the pumping of foundation pit can still be adjusted during rainfall. However, in the case of continuous rainstorm, the water level of foundation pit rises rapidly, so corresponding measures need to be taken in advance. Under the combined action of strong tidal bore and rainfall, the water level of foundation pit has obviously increased, and it has risen rapidly.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: